Recent Planning Applications

Clay Barn Main Street Maplebeck Newark On Trent NG22 0BS

13th May 2026

Proposed siting of four bell tents including a 2 bay cart shed, installation of 6 solar panels to the roof of the fort, creation of a new driveway and car park

Job's Croft Butt Lane Maplebeck Newark On Trent NG22 0BQ

8th May 2026

Construction of 2 no. two-bedroom dwellings.

The Old Vicarage Main Street Maplebeck Newark On Trent NG22 0BS

27th January 2026

T1 - Ash - Tree has recently failed and VIA EM has requested the remainder to be felled as the tree was a multi stem
T2 - Beech - Fell to ground level
T3 - Accacia - Shorten main limb over highway by approx 4m

Job's Croft Butt Lane Maplebeck Newark On Trent NG22 0BQ

13th January 2026

Application for permission in principle for one dwelling

Rose Cottage Church Lane Maplebeck Newark On Trent NG22 0BS

10th December 2025

T1 - Ash Tree to be removed due to Ash die back disease

Maplebeck Farmhouse Maplebeck Farm Main Street Maplebeck Newark On Trent NG22 0BS

26th June 2025

1 Horse Chestnut - Crown lift to obtain 3.5 meters height clearance above ground level all around.

Low Farm Main Street Maplebeck Newark On Trent NG22 0BS

8th October 2024

Application for lawful development certificate for proposed internal replacement works following damage by flooding - see submitted schedule of works.

The Old Vicarage Main Street Maplebeck Newark On Trent NG22 0BS

7th August 2024

Vegetation along the property boundary as marked on the provided plan to be crown lifted to 5.2m over the highway and trim vegetation back from the road edge.

Corner Farm Main Street Maplebeck NG22 0BS

25th April 2024

T1 Mature Eucalyptus (8m tall - 3.5m spread). Multi stemmed tree with a sub-dominant stem starting to cause damage to the wall. Remove the stem closest to the neighbouring wall, retaining the two other stems. Reduce in height be approximately 3 meters for

Clay Barn Main Street Maplebeck Newark On Trent NG22 0BS

15th March 2024

1No Ash tree - Reduce to obtain end height above ground level of approximatley 9mts and end spread of 4mts.

The New House Main Street Maplebeck Newark On Trent NG22 0BS

22nd February 2024

Undertake work s to group of trees - see survey report

Red Hill Farm Church Lane Maplebeck Newark On Trent NG22 0BS

4th October 2023

Fell 1 No. Ash tree

Watsons Farm Main Street Maplebeck Newark On Trent NG22 0BS

27th September 2023

T1 Poplar - Monolith at 4m height

The Thorns Main Street Maplebeck Newark On Trent NG22 0BS

12th September 2023

H1 Portuguese Laurel - reduce to end height of 2m above ground level, reduce sides by 1.5m G1 2 No. Hazel and Portuguese Laurel - Coppice Hazel and reduce Laurel to end height of 2m above ground level T1 1 No. Dead Laurel - Remove to ground level T2 1 No.

Rose Cottage Church Lane Maplebeck Newark On Trent NG22 0BS

17th July 2023

H1 Mixed hedging - reduce to 5ft in height, including removal of 1 No. conifer G1 Mixed species - remove to ground level

Holme Farm Main Street Maplebeck NG22 0BS

12th July 2022

Erection of agricultural storage building.

Rose Cottage Church Lane Maplebeck Newark On Trent NG22 0BS

22nd April 2022

T1 Robinia Acacia, Approx 7m tall. Reduce overall crown by prox 1m to allow for a more aesthetically pleasing tree.

Maplebeck House Main Street Maplebeck Nottinghamshire NG22 0BS

19th April 2022

Increase the height of the internal chimney breast opening at the rear of the property by 750mm in order to locate a WC.

Maplebeck House Main Street Maplebeck NG22 0BS

12th January 2022

Internal works to remove chimney breast at ground and first floor levels

Maplebeck Farm Maplebeck Farmhouse Main Street Maplebeck NG22 0BS

12th January 2022

T1 Horse Chestnut - remove deadwood in excess of 25mm, diseased and crossing branches on the inner canopy. Selectively reduce crown by removing any over extending laterals to enhance natural flow line. Reduce spread to Easterly direction by up to 1.5 metre

Land At Church Lane Maplebeck NG22 0BS

16th March 2021

Request for confirmation to discharge condition 1 attached to planning permission 17/02337/FUL A new dwelling infilling a vacant site between existing properties. (Re-submission)

Mill Barn Main Street Maplebeck NG22 0BS

2nd March 2021

Construction of a timber stable and 30m x 40m manege for private use, including change of use of part of site from agricultural to recreational use.